JavaScript seems to be disabled in your browser. You must have JavaScript enabled in your browser to utilize the functionality of this website.
Tech support: 888-834-0880 contact@flue-pipes.com (9am - 9pm) 7/7
Taxes calculated at checkout. Free transport
Select your ceiling type. We’ll choose the correct support box automatically:
This kit also includes an Attic Insulation Shield and the complete roof exit parts (roof flashing + storm collar + cap). A Floor/Ceiling Radiation Shield is not required for this kit (only used in multi-story homes).
More info (technical): how box height is chosen Installers can size the support box by the joist depth and the desired drop below the finished ceiling (so the black stovepipe connector can attach and clearances are met). Joist Depth*Desired Drop Below CeilingRecommended Box Height 6–8 inches 2–4 inches 12" box 10–12 inches 4–6 inches 24" box 12–14+ inches 6–10 inches 36" box * For sloped ceilings, the support box must extend fully through the ceiling and be trimmed to the roof pitch so it sits flush. Always maintain the required 2" clearance to combustibles.
Installers can size the support box by the joist depth and the desired drop below the finished ceiling (so the black stovepipe connector can attach and clearances are met).
* For sloped ceilings, the support box must extend fully through the ceiling and be trimmed to the roof pitch so it sits flush. Always maintain the required 2" clearance to combustibles.
Use a ceiling support box when your chimney pipe passes vertically through a ceiling and into the attic or upper floor. It ensures structural support, safe clearance, and code compliance. For the area's of use also see below.
Our Square Ceiling Support Box for 6" chimney measures 12.2" x 12.2" and 14.3" x 14.3" for 8" chimney. Both support boxes should fit between the rafters with room to spare so your mark does not need to be perfectly centered between the rafters but it does need to be centered enough for the support box to fit.
Determine the Height of the Stove pipes
Take a measurement from the ceiling to the floor.
Now subtract the total height of the stove (measured from the bottom of the stove to the top of the flue collar) from the ceiling height. Don't forget to subtract any hearth or hearth pad that the stove will sit on.
You also need to subtract the distance that the ceiling support box will extend down into the home. The support box must extend a minimum of 2" below the ceiling to meet clearances.
You only need to be close with your measurements here, not exact. Our black stove pipes cannot be cut to size so you will need one of our telescoping lengths to complete your installation. This gives you lots of "play" in your measurement.
Height of the Class A Pipes
That is :
Distance from the attic floor to the roof
+
Height on the roof
Calculate the required height on the roof
The termination of a chimney above a roof must comply with NFPA 211 and/or CAN/CSA-A405. These codes require the chimney to terminate at least 3 feet above the point it penetrates the roof and 2 feet higher than any part of the building within a 10-foot radius. A UL- or ULC-listed chimney cap must be installed.
What is the 3-2-10 Rule for Chimney Height?
If your chimney is too short, it won't draft properly. Smoke may enter your living space instead of venting outside. But if the chimney is too tall, the flue gases can cool excessively, reducing draft and potentially creating backdraft.
To avoid these problems, use the 3-2-10 rule:
This ensures a safe and effective draft, even with sloped or pitched roofs.
How to Calculate the Correct Chimney Height
Knowing your roof pitch helps determine how high the chimney must extend. Roof pitch is the vertical rise per 12 inches of horizontal run. For example, a 7/12 pitch means the roof rises 7 inches for every 12 inches of run.
Step-by-Step Calculation:
Measure Roof Pitch: Identify the pitch (e.g., 7/12).
Measure Horizontal Distance from Ridge: Use the actual distance or 10 feet (whichever applies).
Calculate Height: Multiply pitch rise by horizontal distance, then add 24 inches.
Example 1: Chimney More Than 10 Feet from Ridge
Pitch: 7/12
Distance: 10 feet
Height: 7 x 10 = 70 inches
Final chimney height = 70 + 24 = 94 inches above roof
Example 2: Chimney 4 Feet from Ridge
Distance: 4 feet
Height: 7 x 4 = 28 inches
Final chimney height = 28 + 24 = 52 inches above roof
Why Proper Clearance Matters
The 3-2-10 rule isn’t just about smoke control. It helps prevent fire risks by keeping hot embers away from the roof and ensures compliance with building codes. Always double-check your local building codes before installation, and consult a professional if in doubt.
The type of flashing depends on the pitch of the roof.
For more information see our Blog
14 Days Guaranteed Return14 day cooling off period whereby your goods can be sent back to us
Limited Lifetime WarrantyOur no quibble promise to you
Lowest Price GuaranteeCheaper elsewhere?; We'll beat it by 5%
Selected products
Our wood stove pipe kits through the attic are complete class A UL103HT stainless steel chimney systems designed to pass through the ceiling, continue through the attic, and exit above the roof.
Not sure which kit fits your setup? Check our wood stove pipe kits to compare options by venting route.
Looking for another kit through the house?
Through Roof 2-Story House Garage
A through-the-attic installation is typically the best fit when your wood stove sits away from an exterior wall and it’s possible to have a straight vertical chimney run through the interior of your home. This type of route is common in living rooms, cabins, cottages, multi-story homes, and workshops where there is no practical exterior wall nearby.
Compared with wood stove pipe kits through the wall, a straight vertical run generally offers:
You should also take your ceiling type into account, as it affects which components the kit will require:
If you don’t have an attic but still want a vertical run, check our wood stove pipe kits through the roof for alternative routing options.
Choosing the right wood stove pipe kit through the attic depends on a few key factors, like:
Also, you should measure the full chimney route following its installation order:
1. From the stove collar to the ceiling transition point.
2. From the attic floor to the underside of the roof deck.
3. From the roof penetration to the final chimney termination height.
The most common available sizes for a through-the-attic installation are:
Not confident about your measurements or which configuration fits your setup? Our free flue design service is available to all customers. Share your stove details and room measurements, and our team will provide a personalized kit recommendation within 24-48 hours.
INSTALLATION OVERVIEW INSTALLATION GUIDE
A successful through-the-attic installation starts with mapping the full chimney path before buying any components.
1. The black stove pipe starts inside the room and connects the stove to the ceiling transition point.
2. At the ceiling, the system transitions to a Class A insulated chimney pipe using a support box suited to your ceiling type.
3. The insulated chimney continues vertically through the attic, protected by an attic insulation shield that keeps the required clearance from surrounding materials.
4. The chimney exits through the roof using the correct flashing for your roof pitch, sealed with a storm collar.
5. Your chimney should end at the proper height above the roof for safe draft and code compliance.
For a detailed step-by-step guidance, check our wood stove chimney pipe installation resources, which include specific instructions for wood stove pipe kits through the attic.
1. Confirm your stove collar diameter, as the chimney system must be an exact match.
2. Remember that a single-wall stove pipe is only used inside the room. Once the vent path reaches the ceiling, the system must transition to a Class A insulated chimney pipe.
3. Measure the full chimney route before ordering, including your attic depth, roof pitch, and total vertical height from the stove collar to the final chimney termination.
4. Check for obstructions in the attic (e.g., rafters, tight framing areas, or HVAC components can affect the planned chimney path).
5. Confirm your ceiling type, as flat ceilings and sloped or vaulted ceilings require different support box styles and affect flashing compatibility.
6. Remember that the Class A insulated chimney must preserve the required air space around framing, ceiling materials, and attic insulation for the entire attic portion of the installation.
7. Apply the 3-2-10 rule to your final chimney height, which requires the chimney to extend at least 3 feet above the roof penetration point and at least 2 feet higher than any part of the structure within 10 feet.
8. Review local building codes and your appliance manual before installation. Requirements can vary by jurisdiction, and your stove manufacturer may have specific clearance or venting instructions that affect your final choice.
No. You can only use a single-wall stove pipe inside the same room as your wood stove. Its outer surface reaches temperatures that create a fire risk near framing, ceiling materials, and attic insulation, making it unsafe and non-compliant for ceiling or attic penetrations.
Once the vent path reaches your ceiling, the system must transition to UL103HT-certified class A chimney pipes. Our through-the-attic kits include the insulated components required for this part of the installation.
Yes. The attic insulation shield sits on the attic floor around the chimney and prevents loose insulation or nearby combustible materials from encroaching on the required clearance zone around the pipe. Without it, insulation can migrate toward the pipe over time. It's one of the components that makes this kit specific to through-the-attic installations.
The 3-2-10 rule for wood stoves means that the chimney must extend at least 3 feet above the roof penetration point and at least 2 feet above any part of the structure within 10 feet. This applies directly to through-the-attic installations, since the chimney terminates above the roof.
You should include this into your total chimney height before selecting the kit, as it directly affects draft performance and code compliance.
Our wood stove pipe kits through the attic are complete Class A chimney systems. Therefore, the components cover the full installation path from the room connection point to the chimney termination above the roof.
1. Adapter and connector pieces: these transition components connect the black single-wall stove pipe inside your room to the Class A insulated chimney system at the ceiling level.
2. Ceiling support box: the structural transition point where the system moves from connector pipe to insulated chimney pipe. It supports the chimney load while preserving the required clearance at the ceiling penetration.
3. Class A insulated chimney pipe sections: these make up the vertical chimney run through the attic and above the roof. The lengths included are based on your attic depth, roof penetration height, and final termination requirements.
4. Attic insulation shield: protects the chimney path inside your attic by keeping the required clearance from insulation and any nearby combustible materials.
5. Roof flashing and storm collar: create a weather-tight seal at your roof exit point, preventing moisture from entering around the chimney penetration.
6. Chimney cap with spark screen: protects your chimney termination from rain, debris, and animals while supporting safer operation above the roofline.
At Flue Pipes, we have been supplying wood stove chimney systems to US homeowners since 2013. With over 5,000 installations supported and a team led by a qualified flue consultant, we know what it takes to get a through-the-attic setup right the first time.
A single-wall stove pipe is not built for contact with structural materials. Its surface temperature is too high for safe passage through ceilings, attic framing, and insulation.
Once the vent crosses the ceiling line, a UL103HT-certified Class A insulated chimney pipe is required. The insulated construction keeps surface temperatures at safe levels and maintains the required clearances through the attic. This is a code requirement that applies to all through-the-attic installations.
Regular maintenance keeps your wood stove pipe kit through the attic drafting properly, reduces fire risk, and extends the working life of its components.
You should inspect the system at least once a year, ideally before the heating season starts, and clean it whenever creosote buildup warrants attention.
Creosote accumulates faster when burning wood with high moisture content or running the stove at low temperatures for long periods. Check:
1. The stove pipe connections inside the room.
2. The chimney sections through the attic (where accessible).
3. The flashing, storm collar and chimney cap above the roof.
You should inspect your through-the-attic chimney system before each burning season. There are several signs that indicate when you should replace it, like:
- Visible corrosion on chimney sections- A damaged or deteriorating chimney cap- Worn or lifting flashing- Loose pipe connections - Any moisture intrusion around the roof exit
In the attic, check if the insulation shield is correctly positioned and that nothing has shifted too close to the chimney. If you notice any changes in draft performance or smoke entering the room, you should investigate it further before the next use.
If you’re not sure of what to do, a professional chimney inspection will identify whether maintenance is enough or whether specific parts need replacing.